Mariager Erhvervspark
Østergade 86, 9560 Hadsund · Hadsund · Norlys
Norlys currently publishes no live status in its open AFIR data, which operators of public chargers are required to provide. Lynoplad therefore cannot show it. Data quality
Charge points
| Charge point | Connector | Power | Price now (incl. VAT) | Status | Uptime 7 / 30 days | Updated |
|---|---|---|---|---|---|---|
| DK*NOR*E3246138 | CCS | 240 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 10:45 |
| DK*NOR*E3246140 | CCS | 240 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 10:45 |
| DK*NOR*E3246141 | CCS | 240 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 10:50 |
| DK*NOR*E3246142 | CCS | 240 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 10:45 |
Tell other drivers whether the charger worked. The operator's status is not always correct – if several drivers report a problem within 24 hours, we show a warning on the charger. Anonymous, no login.
No reports in the last 30 days.
Chargers nearby
| Location | Distance | Power | Price now | Status |
|---|---|---|---|---|
| Stadionvej 5 Hadsund · Norlys | 0.6 km | 22 kW | DKK 3.89 | Unknown |
| Clever Stadionvej 9A Hadsund · Clever | 0.6 km | 13 kW | DKK 2.80 | Available |
| Clever Stadionvej 25 Hadsund · Clever | 0.8 km | 13 kW | DKK 2.80 | Available |
| Tembovej 3, 9560 Hadsund · Norlys | 0.9 km | 22 kW | DKK 3.89 | Unknown |
| Hadsund Kulturhus Hadsund · Norlys | 1.6 km | 22 kW | DKK 3.89 | Unknown |
| OK Hadsund, Himmerlandsgade Hadsund · OK a.m.b.a. | 1.9 km | 75 kW | DKK 4.19 | Available |
| Lidl Hadsund Hadsund · Lidl | 1.9 km | 22 kW | DKK 2.98 | Available |
| Clever Storegade 14A Hadsund · Clever | 1.9 km | 13 kW | DKK 2.80 | Available |
All EV chargers in Hadsund → · All Norlys chargers →
Is something wrong? Send a correction · Methodology
Prices are the operator's ad hoc prices without a subscription and may change every 15 minutes. A charging subscription may be cheaper. Always check the price at the charger or in the operator's app. Uptime is the share of time the charge point has not reported "out of order", measured over 208 hours so far.