OK Hemmet, Tarmvej
Tarmvej 87A, 6893 Hemmet · Hemmet · OK a.m.b.a. · Open 24/7
Price now (no subscription)
DKK 4.19/kWh
Max. power
75 kW
Status · available
2 of 2 available
Confirmed 20 Nov, 11:20
Uptime 7 days
100 %
What does it cost for my car?
DKK 176≈ 42 kWh at today's price. Charging losses (5–10 %) not included.
Charge points
| Charge point | Connector | Power | Price now (incl. VAT) | Status | Uptime 7 / 30 days | Updated |
|---|---|---|---|---|---|---|
| DK*OKO*ECB4*FD1 | CCS | 75 kW | DKK 4.19 per kWh | Available | 100 % / 100 % | 20 Nov, 11:20 |
| DK*OKO*ECB4*FY1 | CCS | 75 kW | DKK 4.19 per kWh | Available | 100 % / 100 % | 20 Nov, 11:20 |
Have you charged here?
Tell other drivers whether the charger worked. The operator's status is not always correct – if several drivers report a problem within 24 hours, we show a warning on the charger. Anonymous, no login.
No reports in the last 30 days.
Chargers nearby
| Location | Distance | Power | Price now | Status |
|---|---|---|---|---|
| Hemmet Plejehjem Hemmet · EWII | 0.3 km | 22 kW | – | Unknown |
| 170441 Bork Automester Hemmet · Nortec A/S | 4.1 km | 11 kW | – | Unknown |
| Clever Langagervej 2 Hemmet · Clever | 4.6 km | 13 kW | DKK 2.80 | Available |
| Bork Havn Nord Hemmet · EWII | 5.8 km | 240 kW | – | Available |
| 170441 - Vester Fælled 118, 6893 Hemmet Hemmet · Nortec A/S | 6 km | 11 kW | – | Unknown |
| Bork Havn Surfstrand Hemmet · EWII | 6.1 km | 22 kW | – | Unknown |
| Bork Havn Syd Hemmet · EWII | 6.1 km | 22 kW | – | Unknown |
| Bork Vikingehavn Hemmet · EWII | 7 km | 22 kW | – | Unknown |
All EV chargers in Hemmet → · All OK chargers →
Is something wrong? Send a correction · Methodology
Prices are the operator's ad hoc prices without a subscription and may change every 15 minutes. A charging subscription may be cheaper. Always check the price at the charger or in the operator's app. Uptime is the share of time the charge point has not reported "out of order", measured over 215 hours so far.