N.G.P TOBACCO ApS-Industriparken 35, 9610 Nørager
Industriparken 35, 9610 Nørager · Nørager · Norlys
Price now (no subscription)
DKK 3.00/kWh
Max. power
22 kW
Status · available
Unknown
Uptime 7 days
–
The operator's data for this charger currently contains no live status. Data quality
What does it cost for my car?
DKK 126≈ 42 kWh at today's price. Charging losses (5–10 %) not included.
Charge points
| Charge point | Connector | Power | Price now (incl. VAT) | Status | Uptime 7 / 30 days | Updated |
|---|---|---|---|---|---|---|
| DK*NOR*E3585859 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3585860 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3585861 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3585862 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3585863 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3585865 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3585866 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3585867 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3587378 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
| DK*NOR*E3587379 | Type 2 | 22 kW | DKK 3.00 per kWh | Unknown | – / – | – |
Have you charged here?
Tell other drivers whether the charger worked. The operator's status is not always correct – if several drivers report a problem within 24 hours, we show a warning on the charger. Anonymous, no login.
No reports in the last 30 days.
Chargers nearby
| Location | Distance | Power | Price now | Status |
|---|---|---|---|---|
| OSP ApS - Industriparken 27, 9610 Nørager Nørager · Norlys | 0.2 km | 22 kW | – | Unknown |
| McDonald's - Haverslev Nørager · Norlys | 0.5 km | 400 kW | DKK 4.39 | Available |
| OK Haverslev, Jyllandsgade Nørager · OK a.m.b.a. | 0.6 km | 400 kW | DKK 4.39 | Available |
| Circle K Nørager Nørager · Circle K | 0.6 km | 400 kW | DKK 3.69 | Available |
| IONITY GmbH IONITY Nørager Norager · IONITY | 0.6 km | 350 kW | DKK 4.17 | Available |
| Q8 Q8 Himmerland Motorvej Øst Suldrup · Q8 | 6.6 km | 400 kW | – | Available |
| Circle K Motorvejscenter Himmerland Suldrup · Circle K | 6.7 km | 400 kW | DKK 3.69 | Available |
| Clever Hobrovej 11 Arden · Clever | 7.6 km | 13 kW | DKK 2.80 | Available |
All EV chargers in Nørager → · All Norlys chargers →
Is something wrong? Send a correction · Methodology
Prices are the operator's ad hoc prices without a subscription and may change every 15 minutes. A charging subscription may be cheaper. Always check the price at the charger or in the operator's app. Uptime is the share of time the charge point has not reported "out of order".