McDonald's - Struer
Industrivej 1A, 7600 Struer · Struer · Norlys
Norlys currently publishes no live status in its open AFIR data, which operators of public chargers are required to provide. Lynoplad therefore cannot show it. Data quality
Charge points
| Charge point | Connector | Power | Price now (incl. VAT) | Status | Uptime 7 / 30 days | Updated |
|---|---|---|---|---|---|---|
| DK*NOR*E3733719 | CCS | 400 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 16:00 |
| DK*NOR*E3733720 | CCS | 400 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 15:55 |
| DK*NOR*E3733723 | CCS | 400 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 15:50 |
| DK*NOR*E3733724 | CCS | 400 kW | DKK 4.39 per kWh | Unknown | 100 % / 100 % | 21 Nov, 15:55 |
Tell other drivers whether the charger worked. The operator's status is not always correct – if several drivers report a problem within 24 hours, we show a warning on the charger. Anonymous, no login.
No reports in the last 30 days.
Chargers nearby
| Location | Distance | Power | Price now | Status |
|---|---|---|---|---|
| IONITY GmbH IONITY Struer Struer · IONITY | 0 km | 400 kW | DKK 3.86 | Available |
| Clever Industrivej 1B Struer · Clever | 0.1 km | 150 kW | DKK 4.00 | Available |
| Vesterled Struer · EV-EL | 0.1 km | 240 kW | DKK 3.49 | Available |
| Circle K Struer Struer · Circle K | 0.1 km | 400 kW | DKK 3.69 | Available |
| Løvbjerg Struer Struer · Norlys | 0.3 km | 300 kW | DKK 4.39 | Unknown |
| Uno-X REMA 1000 Struer Struer · Uno-X Mobility Danmark A/S | 0.4 km | 22 kW | DKK 3.89 | Unknown |
| Clever Park Alle 14 Struer · Clever | 0.5 km | 13 kW | DKK 2.80 | Available |
| Clever Park Alle 2 Struer · Clever | 0.6 km | 13 kW | DKK 2.80 | Available |
All EV chargers in Struer → · All Norlys chargers →
Is something wrong? Send a correction · Methodology
Prices are the operator's ad hoc prices without a subscription and may change every 15 minutes. A charging subscription may be cheaper. Always check the price at the charger or in the operator's app. Uptime is the share of time the charge point has not reported "out of order", measured over 197 hours so far.