McDonald's - Vejen
Vestermarksvej 4, 6600 Vejen · Vejen · Norlys
Price now (no subscription)
DKK 4.39/kWh
Max. power
400 kW
Status · available
8 of 8 available
Confirmed 20 Nov, 08:55
Uptime 7 days
100 %
What does it cost for my car?
DKK 184≈ 42 kWh at today's price. Charging losses (5–10 %) not included.
Charge points
| Charge point | Connector | Power | Price now (incl. VAT) | Status | Uptime 7 / 30 days | Updated |
|---|---|---|---|---|---|---|
| DK*NOR*E3733775 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 19 Nov, 23:30 |
| DK*NOR*E3733877 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 19 Nov, 23:20 |
| DK*NOR*E3733911 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 19 Nov, 23:25 |
| DK*NOR*E3733920 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 19 Nov, 23:40 |
| DK*NOR*E4513645 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 20 Nov, 08:55 |
| DK*NOR*E4513649 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 20 Nov, 08:50 |
| DK*NOR*E4513654 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 19 Nov, 23:45 |
| DK*NOR*E4513655 | CCS | 400 kW | DKK 4.39 per kWh | Available | 100 % / 100 % | 19 Nov, 23:45 |
Have you charged here?
Tell other drivers whether the charger worked. The operator's status is not always correct – if several drivers report a problem within 24 hours, we show a warning on the charger. Anonymous, no login.
No reports in the last 30 days.
Chargers nearby
| Location | Distance | Power | Price now | Status |
|---|---|---|---|---|
| Uno-X Vejen Vejen · Uno-X Mobility Danmark A/S | 0.1 km | 300 kW | DKK 4.39 | Unknown |
| OK Vejen, Industrivej Vest Vejen · OK a.m.b.a. | 0.6 km | 240 kW | DKK 3.49 | Available |
| Afd. 20 - Bloksbjergparken 2 Vejen · EWII | 0.9 km | 22 kW | – | Unknown |
| Clever Industrivej Vest 39 Vejen · Clever | 1.1 km | 13 kW | DKK 2.80 | Available |
| Solar - Grus p-pladsen Vejen · Spirii ApS | 1.1 km | 22 kW | – | Available |
| Solar - ny p-plads Vejen · Spirii ApS | 1.1 km | 22 kW | – | Available |
| Solar - ved hegnet Vejen · Spirii ApS | 1.1 km | 22 kW | – | Available |
| Afd. Lærkevej 47 Vejen · EWII | 1.1 km | 22 kW | – | Unknown |
All EV chargers in Vejen → · All Norlys chargers →
Is something wrong? Send a correction · Methodology
Prices are the operator's ad hoc prices without a subscription and may change every 15 minutes. A charging subscription may be cheaper. Always check the price at the charger or in the operator's app. Uptime is the share of time the charge point has not reported "out of order", measured over 154 hours so far.