Hotel LEGOLAND
Åstvej 10, 7190 Billund · Billund · Legoland Aps
Legoland currently publishes no live status in its open AFIR data, which operators of public chargers are required to provide. Lynoplad therefore cannot show it. Data quality
Charge points
| Charge point | Connector | Power | Price now (incl. VAT) | Status | Uptime 7 / 30 days | Updated |
|---|---|---|---|---|---|---|
| DK*MON*E2981130 | CCS | 150 kW | DKK 6.00 per kWh + DKK 1.00 other fee | Unknown | 100 % / 100 % | 22 Nov, 00:55 |
| DK*MON*E5206444 | CCS | 150 kW | DKK 6.00 per kWh | Unknown | 100 % / 100 % | 21 Nov, 13:55 |
Tell other drivers whether the charger worked. The operator's status is not always correct – if several drivers report a problem within 24 hours, we show a warning on the charger. Anonymous, no login.
No reports in the last 30 days.
Chargers nearby
| Location | Distance | Power | Price now | Status |
|---|---|---|---|---|
| Hotel LEGOLAND Billund · Legoland Aps | 0 km | 22 kW | – | Unknown |
| Clever Åstvej 10 Billund · Clever | 0.1 km | 13 kW | DKK 2.80 | Available |
| Billund Bad Billund · EWII | 0.1 km | 240 kW | DKK 4.20 | Unknown |
| Castle Hotel LEGOLAND Billund · Legoland Aps | 0.2 km | 11 kW | – | Unknown |
| Legoland Priority Parkering Billund · Legoland Aps | 0.2 km | 22 kW | – | Unknown |
| LEGOLAND Parkering P1 Billund · Legoland Aps | 0.3 km | 11 kW | – | Unknown |
| The Lodge Billund · Norlys | 0.4 km | 22 kW | DKK 2.75 | Unknown |
| Clever Ellehammers Alle 3 Billund · Clever | 0.5 km | 13 kW | DKK 2.80 | Available |
All EV chargers in Billund → · All Legoland chargers →
Is something wrong? Send a correction · Methodology
Prices are the operator's ad hoc prices without a subscription and may change every 15 minutes. A charging subscription may be cheaper. Always check the price at the charger or in the operator's app. Uptime is the share of time the charge point has not reported "out of order", measured over 202 hours so far.