← All chargers

Legoland Priority Parkering

Åstvej 15, 7190 Billund · Billund · Legoland Aps

Price now (no subscription)
Not provided
Max. power
22 kW
Status · available
Unknown
Uptime 7 days
–

Legoland currently publishes no live status in its open AFIR data, which operators of public chargers are required to provide. Lynoplad therefore cannot show it. The operator's data for this charger currently contains no ad hoc prices. Check the price at the charger or in the operator's app. Data quality

Charge points

Charge pointConnectorPowerPrice now (incl. VAT)StatusUptime 7 / 30 daysUpdated
DK*MON*E6123717Type 222 kWNot providedUnknown– / ––
DK*MON*E6123811Type 222 kWNot providedUnknown– / ––
DK*MON*E6123816Type 222 kWNot providedUnknown– / ––
DK*MON*E6123823Type 222 kWNot providedUnknown– / ––
DK*MON*E6123841Type 222 kWNot providedUnknown– / ––
DK*MON*E6123884Type 222 kWNot providedUnknown– / ––
DK*MON*E6123888Type 222 kWNot providedUnknown– / ––
DK*MON*E6123891Type 222 kWNot providedUnknown– / ––
DK*MON*E6123913Type 222 kWNot providedUnknown– / ––
DK*MON*E6123915Type 222 kWNot providedUnknown– / ––
Have you charged here?

Tell other drivers whether the charger worked. The operator's status is not always correct – if several drivers report a problem within 24 hours, we show a warning on the charger. Anonymous, no login.

No reports in the last 30 days.

🔔 Price alert

Get an email when the price here drops below your limit. At most one email per 12 hours – unsubscribe with one click.

We only use your email for the price alert and delete it when you unsubscribe. Privacy policy (Danish)

Chargers nearby

LocationDistancePowerPrice nowStatus
Castle Hotel LEGOLAND
Billund · Legoland Aps
0.1 km11 kW–Unknown
LEGOLAND Parkering P1
Billund · Legoland Aps
0.1 km11 kW–Unknown
Hotel LEGOLAND
Billund · Legoland Aps
0.2 km22 kW–Unknown
Hotel LEGOLAND
Billund · Legoland Aps
0.2 km150 kWDKK 6.00Unknown
Clever Åstvej 10
Billund · Clever
0.3 km13 kWDKK 2.80Available
Billund Bad
Billund · EWII
0.3 km240 kWDKK 4.20Unknown
Clever Ellehammers Alle 3
Billund · Clever
0.4 km13 kWDKK 2.80Available
The Lodge
Billund · Norlys
0.4 km22 kWDKK 2.75Unknown

All EV chargers in Billund → · All Legoland chargers →

Is something wrong? Send a correction · Methodology

Prices are the operator's ad hoc prices without a subscription and may change every 15 minutes. A charging subscription may be cheaper. Always check the price at the charger or in the operator's app. Uptime is the share of time the charge point has not reported "out of order".